Hunter Memorial Hospital Controls Upgrade

Description:

Phase 1 Building Automation System retrofit utilizing Reliable Controls© products, Mach-Pro Web, Mach Pro Sys, Mach Pro Point, and Mach Pro Zone. 

The system is a native BACnet DDC system including web browser access, 3D graphical interface, operator workstation, trending, custom scheduling and programming.

All pneumatic actuators and sensors were replaced with new electronic devices. Re-commission and optimize HVAC system including CO2 monitoring (on demand ventilation), and optimal start/stop scheduling.

To fit the customers’ budget the existing zone controls were integrated with the new main plant controls.

Phase 2 BACnet integration of new Trane Chiller via MS/TP including addition of graphics to existing workstation, alarming, trending, and interlocking with existing systems.

Project Info

  • Owner: :
    Interlake/Eastern Regional Health Authority
  • Project; :
     Hunter Memorial Hospital Controls Upgrade
  • Location: :
    Teulon, MB
  • Date Completed: :
    Phase 1 - 2011 Phase 2 - 2013
  • General Contractor::
    Tri-Star Automation
  • Consultant: :
    MCW/AGE Consulting